Amber packed the place out: standing room only! She discussed the upcoming changes to the Portland 2016 Stormwater design manual.
Public Comment Period April 4 – May 6
- – All documents and instructions posted online: www.portlandoregon.gov/bes/70389
- – Includes 2014 SWMM and 2016 SWMM and SCM crosswalk
- – Submit comments to: BESStormManual@portlandoregon.gov
Adoption: July 1st 2016
- – Three month phase-in (use 2014 SWMM or 2016 SWMM/SCM)
- – 2016 SWMM and 2016 SCM required starting October 1st 2016