Amber Clayton on the Portland 2016 SWMM

Amber packed the place out: standing room only! She discussed the upcoming changes to the Portland 2016 Stormwater design manual.

Public Comment Period April 4 – May 6portland map

Adoption: July 1st 2016

  • – Three month phase-in (use 2014 SWMM or 2016 SWMM/SCM)
  • – 2016 SWMM and 2016 SCM required starting October 1st 2016

Attachments